WILLING DEVELOPMENT TRAFFIC MANAGEMENT

Construction at 139-141 Lake Street Perth is currently underway.

For Willing Development to work safely, they are required to submit a Traffic Management Plan for the proposed temporary road obstructions and closures.

The proposed mixed-use development is a seven storey building with basement floor proposing a restaurant/cafe and a total of 29 apartments across all floors including a mix of one, two and three bedroom apartments.

The site will be secured using appropriate fences and hoardings, with access gates on Lake and Church street.

Access to Stuart Street reserve and surrounding areas will be available via detour routes noted in the Traffic Guidance Schemes (TGS) below.

Willing Build has applied for an obstruction permit for their crane operations that is adjacent to the site. Refer to the Traffic Guidance Scheme (TGS) below. 

Obstruction Permit ENG P0010-A

Obstruction Permit ENG-P0010-A

Period of Validity: 13th October 2026 - 13th March 2027

Traffic Management Plan No: 2605-TGS36911-001-1

See below approved Traffic Guidance Schemes (TGS) according to Traffic Management Plan 2605-TGS36911-001-1

Construction site and Work Zone permit areas along Lake street.
Partial lane obstruction and pedestrian management for safe detour around the site.
Obstruction within Lake street to facilitate crane and concrete truck operations.
This is TGS is for out of hours unassisted access and egress on Lake Street between Church Street and Forbes Road.

FAQs

Road Closure

A road closure means a road (or part of a road) is officially closed to traffic. Vehicles are generally not permitted to pass through the closed section.

Road Obstruction

A road obstruction is any blockage or hazard on a roadway that interferes with normal traffic movement and may require drivers to slow down, stop, or take an alternative route.

Please refer to the website, if an approved permit is valid above for Lake Street obstructions and closures. Willing Build will send notification letters before obstructions and closures are implemented which forms part of the permit conditions.

Note: The Permit will be valid for a total of number concrete pouring days between specified dates on the permit.

Please refer to the website, if an approved permit is valid above for Lake Street obstructions and closures. Willing Build will send notification letters before obstructions and closures are implemented which forms part of the permit conditions.

Note: The Permit will be valid for a total of number concrete pouring days between specified dates on the permit.

Does the permit cover construction noise issues?

Permits to obstruct and/or close roads do not address noise. For further information on how noise is addressed, please visit the Imagine Vincent. 

The Traffic Management Plan (TMP) is a detailed technical document prepared by the contractor and reviewed by the City as part of the permit process.

It is not published as it is not a public-facing document and may contain commercially sensitive and operational information.

To support transparency, the City publishes approved Traffic Guidance Schemes (TGS), which show the on-ground traffic and pedestrian arrangements relevant to residents and road users.

The City assesses compliance against the full approved documentation and undertakes regular site inspections to ensure works are carried out safely and in accordance with permit conditions.

 

Contact

For all enquiries or complaints about construction activities, contact:

Willing Build

Trevor Keaney

0420 274 889

For after-hours emergencies, please contact City of Vincent Rangers on 9273 6000.

For further information please visit Imagine Vincent