Project number |
Project 406 |
Detailed design |
Starting August 2024 |
Estimated construction start date |
Ealy 2027 |
Estimated duration |
Approximately 30 months |
Western Power and the City of Vincent are working together to convert the overhead electricity distribution network in the Leederville area to underground power. As part of this project, Western Power will be installing new underground cabling, primary equipment (transformers and switchgear) LED streetlights.
PRIMARY EQUIPMENT INSTALLATION
Primary equipment is infrastructure that is essential for the delivery of electricity to consumers. It includes transformers and switchgear units that enable the distribution of electricity to residents in the local area.
Currently most primary equipment is located on power poles. As the electricity distribution network is undergrounded, primary equipment needs to be relocated to ground level.
Where possible, primary equipment will be located in parks, public open spaces, road reserves and verges. Every effort is being made to ensure that chosen sites have the lowest impact on the surrounding area, with landscaping or screening to be added where possible and the total footprint of the equipment kept to a minimum.
Switchgear
Primary equipment site with a switchgear.
Transformer
Primary equipment site with a transformer.
Combination
Primary equipment site with a combination of equipment.
MORE INFORMATION AND FEEDBACK
Community consultation on primary equipment sites in this project area is expected in late 2024/early 2025. Western Power will complete the underground network design after all feedback has been reviewed.
For more information about this project, sign up to Vincent’s eNewsletter.