Roads and Footpaths

The City undertakes maintenance and renewal works on 144km of roads and 260km of footpaths.  

Vincent manages local roads, while Main Roads WA are responsible for the state’s road network.

To have your say on road and footpath projects, visit Imagine Vincent to see projects open for consultation.

Current projects

Latest road and footpath news

Proposed changes on Harold Street
Posted 24 January 2024 Proposed changes on Harold Street

The City of Vincent is seeking feedback from residents on a proposal to make a section of Harold Street one-way between Vincent and Beaufort streets.

Enhancing tree health with permeable paving trial
Posted 03 January 2024 Enhancing tree health with permeable paving trial

The City of Vincent is expanding its trial of permeable paving around trees in the medians of Scarborough Beach Road between The Boulevarde and Oxford Street, Mt Hawthorn.

Green light for 40km/h speed limit on all local access roads
Posted 19 October 2023 Green light for 40km/h speed limit on all local access roads

The speed limit on all local access roads in Vincent will drop to 40km/h.

Tony Di Scerni pathway resurfacing works
Posted 13 September 2023 Tony Di Scerni pathway resurfacing works

Resurfacing works at the Tony Di Scerni pathway will start on 18 September.

Newcastle Street, between Oxford and Loftus streets, Leederville - Speed
Posted 25 August 2023 Newcastle Street, between Oxford and Loftus streets, Leederville - Speed Reduction Proposal

The City of Vincent is seeking feedback on a proposal to reduce the speed limit from 60km/h to 30km/h on Newcastle Street, between Oxford and Loftus streets, Leederville.

Diagonal diversion trial ends
Posted 18 May 2023 Diagonal diversion trial ends

The City of Vincent will be ending the diagonal diversion trial on the corner of Alma Road and Leake Street, North Perth.